Abd El-Razek, M E, Bassioni, H A and Mobarak, A M (2008) Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering and Management, 134(11), 831–41.

Choi, H and Mahadevan, S (2008) Construction Project Risk Assessment Using Existing Database and Project-Specific Information. Journal of Construction Engineering and Management, 134(11), 894–903.

  • Type: Journal Article
  • Keywords: Construction management; Databases; Information management; Fuzzy sets; Risk management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(894)
  • Abstract:
    This paper develops a risk assessment methodology for construction projects by combining existing large quantities of data and project-specific information through updating approaches. Earlier studies have indicated that risk assessment is still difficult for practicing engineers to use due to the requirement of data on too many input variables. However, the availability of existing large quantities of data and project-specific information makes it possible to simplify the risk assessment procedure. Two main ideas are pursued in this paper to facilitate practical implementation: identify and evaluate the critical risk events, and develop a systematic updating methodology. Both epistemic and aleatory types of uncertainties in the data are considered, and corresponding updating procedures are developed. The proposed methodology is illustrated for the construction risk assessment of a cable-stayed bridge.

Eom, C S, Yun, S H and Paek, J H (2008) Subcontractor Evaluation and Management Framework for Strategic Partnering. Journal of Construction Engineering and Management, 134(11), 842–51.

Hu, J, Ren, Z and Shen, L (2008) Impacts of Overseas Management Structures on Project Buyout Management: Case Studies of Chinese International Contractors. Journal of Construction Engineering and Management, 134(11), 864–75.

Kang, Y, O’Brien, W J, Thomas, S and Chapman, R E (2008) Impact of Information Technologies on Performance: Cross Study Comparison. Journal of Construction Engineering and Management, 134(11), 852–63.

Kim, J and Ellis, R D (2008) Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. Journal of Construction Engineering and Management, 134(11), 904–13.

Kong, D, Tiong, R L, Cheah, C Y, Permana, A and Ehrlich, M (2008) Assessment of Credit Risk in Project Finance. Journal of Construction Engineering and Management, 134(11), 876–84.

Schatteman, D, Herroelen, W, Van de Vonder, S and Boone, A (2008) Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects. Journal of Construction Engineering and Management, 134(11), 885–93.